MT RAWDON TSF wall raise This project was for the Stage 5B raise the existing Mt Rawdon Tailings Storage Facility (TSF) from RL180m to RL181m. The detailed requirement for the project included: - The mobilisation and demobilisation for 12 number pieces of mine approved earthworks - The establishment and...

Rio Tinto Gove Pond 5 Closure This project includes the construction of civil and associated works to cap Pond 5 at the Rio Tinto Gove site. The Early works package included mud farming and Tailings Improvement and aimed to improve the tailing of Pond 5 with the...

Australia Pacific LNG (APLNG) Site Works Project McCosker Contracting formed a fully integrated joint venture with Fulton Hogan. The FHMJV performed the civil site works contract (bulk earthworks) on the Australia Pacific LNG (APLNG) development project with Bechtel Oil and Gas. Work was performed over a period of...

GLADSTONE Wall Raise Projects /*! elementor - v3.17.0 - 08-11-2023 */ .elementor-widget-image{text-align:center}.elementor-widget-image a{display:inline-block}.elementor-widget-image a img[src$=".svg"]{width:48px}.elementor-widget-image img{vertical-align:middle;display:inline-block} Rio Tinto Aluminium Yarwun Pty LtdDam raise includes: clearing, grabbing and stockpiling of vegetation; removal and stockpiling of top soil and Unsuitable Material; borrow pit development (including materials processing and handling and...