Eungella Rising Main RealignmentMcCosker installed a new rising main from the BMA pump station offtake at the base of the dam wall embankment, connecting into the existing main south of the spillway bridge. Length of the rising main was 577m, the rising main consisted of...

Gas Gathering Network This project included supply and install of 450mm and 315mm HDPE, and tying-in wellheads to the gas gathering networks, with over 15km laid in trench. Installation also included low point drains. Works were successfully complete whilst overcoming extreme weather events of both rain and...

DAUNIA HDPE Water Pipeline McCosker completed a new 15.652km Daunia spur pipeline (DN 400mm HDPE PN20) run from the BMC owned Braeside pipeline terminating at the existing Daunia DN355 Pn10 HDPE line that feeds Daunia Dam 2, which in turn feeds the Coal Handling Process Plant...

Moura and QAL Water Pipelines Separable Portion 1: OB South Gladstone DN600 Moura Rail Crossing Clear and grub a new pipeline alignment including suitable width for pipe stringing, placement. Supply and install new tubular steel pipe bridge (52m span) including access laddero ver existing QLD Rail infrastructure, and...