ALDOGA SOLAR FARM SUBSTATION

Greenfields site scope of works inclusive of civil and bulk earthworks supporting construction of a Substation for the Aldoga Solar Farm.

 

Clear and grub followed by bulk and final trim excavation to establish footprint, material conditioning and placement, locally imported material placed in layers conditioned and used of mechanical compaction methods used to achieve and/or exceed QA requirements.

 

Trenching excavation and backfill of underground services with layer placement and compactive effort to meet and exceed QA conformance. Additional excavation, subgrade and foundation treatment for underside of slabs and structures with testing to ensure compliance to load bearing strength requirements.

 

Manage all dewatering of subsurface ground water and control of surface water; All drainage infrastructure; All traffic management; All security infrastructure including fencing, access gates & locks.

 

Supply and manage import of aggregate, unsealed and sealed pavement products; Supply and placement of all cementitious products including concrete, grouts and stabilised backfills; Supply, placement, fix and support of all steel reinforcement products & steel structures.

Client

GenusPlus Group

Location

Aldoga via Gladstone

Discipline

Civil concrete

Duration

1.5 years

Value

/

Category
Civil Concrete